
A long-
This would dramatically reduce energy requirements, exhaust emissions and expenses in shipping goods and raw materials by sea and provide an alternative to airline passenger service.
One possible method for crossing the Bering Strait, proposed here, is long, prefabricated
tunnel segments. They would be fabricated on dry land below sea level in an area
surrounded by man-
The area would then be flooded and the tunnel segments (temporarily capped on the ends) would be floated to excavated trenches in the Bering Strait between the Diomede Islands, Russia, and Alaska, and then lowered into position. The sloped sections of tunnel would be fabricated on site after sea walls and dikes are built from the coasts of the Diomedes, Russia, and Alaska.
These man-
The prefabricated tunnel design is a possible option to bored tunnels.
As well as rail lines-
This project has the potential to improve the economy and stability throughout the world.

There are many considerations in attempting such a project, both technical and political. Only a few of the important technical aspects are reviewed here.
